About Badr System

Badr system history

05 Mon، 2024 Visit: 2536
Introducing the founder

Dr. Alireza Darvishi is a retired university professor specializing in CAD/CAM/CAE and Artificial Intelligence. He has done his BSc. in Mechanical Engineering in Iran, MSc. Mechanical Engineering in the USA & PhD at the Leeds University –UK. 32 years ago, he founded BADR Engineering System- BES – Pjsc, a family-owned company to serve Parts Manufacturing, Tool Making & R&D for Automotive Industries using CAD/CAM/CAE, Casting Process Simulation, Rapid Prototyping (RP) & Rapid Tooling (RT)Technologies. Later, focused on Gas Turbine Industry (for the past 23 years). BADR is name of a mountain in Kurdistan of Iran his place of birth, a small village, called “Vayhaj”, Located at vicinity of BADR mountain. BADR is also a Persian word meaning “Full Moon”. BES in on the Approved Vender List (AVL) of Tavanir, Oil, Gas & Petrochemical Industries and has experience on SGT100~400, V94.2, BBC 13D, Mitsubishi 701B, RR Avon, GE F5 (5001 & 5002), F6 & F9, Werkspoor, Ruston TA 1750, EM85, TB 4000, Solar Family, Sulzer S7 and … gas turbines.

The beginning of our activity in the 80s

19

80

1980

The beginning of our activity in the 80s

Badr Engineering System Company BES(Pjsco) was founded by Dr. Alireza Darvishi a university professor as a knowledge-based private company to develop new technologies in the field of manufacturing Hi-Tech parts and equipment in 1991. Focusing on CAD/CAM/CAE techniques, BES has based its activities in three areas: - Flexible Manufacturing system (FMS) - Maintenance/Refurbishment/Repairs (MRO) - Engineering Consultancy Services (ECS) BES principal clients are power plant, oil, gas, petrochemical industries, civil aviation, rail transportation and providing services in the fields of road and marine transportation, agricultural, mining, and medical industries are also considered. The main goal of BES is paying particular attention to the clients’ needs and developing a specific process during the stages of each project.

90

1990

Badr system development in the 90s

Badr system development in the90s, the efforts of the management and personnel of the system were focused on the development of equipment capabilities and the creation of a modern factory physical infrastructure in the form of a rapid design, prototyping and modeling system to accelerate the compilation of technical knowledge, which these goals were successfully achieved. It was fulfilled in this day. Bader system development in the 80s, the efforts of the management and personnel of the system were focused on the development of equipment capabilities and the creation of a modern factory physical infrastructure in the form of a rapid design, prototyping and modeling system to accelerate the compilation of technical knowledge, which these goals were successfully achieved. It was fulfilled in this day.

00

2000

The prosperity of Badr in the world arena

With the beginning of this decade, considering the technical achievements and gaining valuable experiences and successes in the field of producing complex parts with high technical precision and sensitivity in advanced industries such as power and oil, as well as in line with the company's vision, Badr System started to The production of parts in the passenger aviation industry has been successful and until today, in parallel with the development of the technical knowledge of gas turbines, it challenges its ability to produce complex parts in other fields.

20

2020

Badr system's perspective

Our goal in this decade is to develop the design, production and repair infrastructure of power plant turbines to provide more services inside and outside the country.

30

2030

future

Future goals

Contact with sad

asd
Phone: asd
fax: asd
Email: sd
Send Message